Tendering Authority: Urban Development And Housing Department
Tender ID4058768
Organisation NameUrban Development And Housing Department
Tender BriefAppointment Of Contractor For Connection To Upcoming Development, Various Works Of Water/ Drainage Infrastructure Including Pre & Post Monsoon Activities In Gift City
Last Date For Submission18th May, 2026
Opening DateRefer to Documents
Cost
Document Cost10000.00
EMD1276000.00
Estimated Cost63800000.00
Location
CityGandhinagar
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
11200006968:EXCAVATION-0.00 TO 1.50 M-LEAD GIFT BOUN: Earthwork for trenches and machine-holes in all types of soil such as murrum, sand, sandy silt, clay, black cotton soil, soil mixed with boulder, bajri, kankar etc. stacking excavated stuff and serviceable materials clear from the edges of the trenches, including removal of stumps of trees of girth of all sizes disposal of unserviceable materials etc. including dewatering, shuttering, shoring, strutting or any other safe methods for protection, dressing of sides and ramming of bottom, and transporting the excavated material with all lead and lift within GIFT boundary etc. complete as per Drawing, specification and as directed by Engineer-in-charge. Depth from 0.0 up to 1.5 m."5000.000M3
21200006969:EXCAVATION-1.51 TO 3.00 M-LEAD GIFT BOUN: Earthwork for trenches and machine-holes in all types of soil such as murrum, sand, sandy silt, clay, black cotton soil, soil mixed with boulder, bajri, kankar etc. stacking excavated stuff and serviceable materials clear from the edges of the trenches, including removal of stumps of trees of girth of all sizes & disposal of unserviceable materials etc. including dewatering, shuttering, shoring, strutting or any other safe methods for protection, dressing of sides and ramming of bottom, and transporting the excavated material with all lead and lift within GIFT boundary etc. complete as per Drawing, specification and as directed by Engineer-in-charge. Deeper than 1.51 m to a depth of 3.00m".2500.000M3
31200006970:EXCAVATION-3.01 TO 4.50 M-LEAD GIFT BOUN: Earthwork for trenches and machine-holes in all types of soil such as murrum, sand, sandy silt, clay, black cotton soil, soil mixed with boulder, bajri, kankar etc. stacking excavated stuff and serviceable materials clear from the edges of the trenches, including removal of stumps of trees of girth of all sizes & disposal of unserviceable materials etc. including dewatering, shuttering, shoring, strutting or any other safe methods for protection, dressing of sides and ramming of bottom, and transporting the excavated material with all lead and lift within GIFT boundary etc. complete as per Drawing, specification and as directed by Engineer-in-charge. Deeper than 3.01 m to a depth of 4.50 m".1000.000M3
41200006971:EXCAVATION-4.51 TO 6.50 M-LEAD GIFT BOUN:"Earthwork for trenches and machine-holes in all types of soil such as murrum, sand, sandy silt, clay, black cotton soil, soil mixed with boulder, bajri, kankar etc. stacking excavated stuff and serviceable materials clear from the edges of the trenches, including removal of stumps of trees of girth of all sizes & disposal of unserviceable materials etc. including dewatering, shuttering, shoring, strutting or any other safe methods for protection, dressing of sides and ramming of bottom, and transporting the excavated material with all lead and lift within GIFT boundary etc. complete as per Drawing, specification and as directed by Engineer-in-charge. Deeper than 4.51 m to a depth of 6.50 m".300.000M3
51200006972: EXCAVATION-6.51 TO 8.50 M-LEAD GIFT BOUN: "Earthwork for trenches and machine-holes in all types of soil such as murrum, sand, sandy silt, clay, black cotton soil, soil mixed with boulder, bajri, kankar etc. stacking excavated stuff and serviceable materials clear from the edges of the trenches, including removal of stumps of trees of girth of all sizes & disposal of unserviceable materials etc. including dewatering, shuttering, shoring, strutting or any other safe methods for protection, dressing of sides and ramming of bottom, and transporting the excavated material with all lead and lift within GIFT boundary etc. complete as per Drawing, specification and as directed by Engineer-in-charge. Deeper than 6.51 m to a depth of 8.50 m".50.000M3
18th May, 2026