Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Urban Development And Housing Department
Tender ID3772949
Organisation NameUrban Development And Housing Department
Tender BriefCorrigendum : Interior Renovation Works At Different Plants Of Gift City
Last Date For Submission7th Apr, 2026
Opening DateRefer to Documents
Cost
Document Cost5000.00
EMD135000.00
Estimated Cost6845000.00
Location
CityGandhinagar
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
11200016384: DISMANTLING OF EXISTING CIVIL ITEM: Dismantling of existing furniture /wall panelling /partition / ceiling /curtain /etc and disposal/stacking of dismantled items, including loading, unloading, transportation, all work shall be done as per the instructions of the engineer-in-charge.2.000LS
21200016385: DISMANTLING OF EXISTING ELECTRIC ITEM: Dismantling of existing lighting fixture , wiring and disposal/stacking of dismantled items, including loading, unloading, transportation, all work shall be done as per the instructions of the Engineer-in-Charge.2.000LS
31200016386: PandF POP PUNNING: Providing and fixing 6 to 12mm thick pop punning as per manufacturer's specification and all work shall be done as per the instructions of the Engineer-in-Charge.125.000M2
41200016441: PandL FLOORING VITRIFIED TILE: "Providing and laying flooring with 1200 mm x 600 mm Vitrified Tiles Make : Nitco or equivalent and sample in pattern as per detailed drawings on up to 35 mm to 45mm thick bed of cement sand mortar in a ratio of 1: 6, including surface preparation, applying neat cement float, giving necessary slopes, cleaning joints etc complete. Cost should be inclusive of cement screed in case the bedding thickness increases beyond 25 mm, it should also include the cost of hacking the existing IPS floor and all work shall be done as per the instructions of the Engineer-in-Charge."200.000M2
51200016387: PandL VITRIFIED TILE SKIRTING: Providing and laying Vitrified Tiles Skirting 75mm wide including surface preparation, applying neat cement float, giving necessary slopes, cleaning joints etc complete. Cost should be inclusive of cement screed in case the bedding thickness increases beyond 25 mm, it should also include the cost of hacking the existing IPS Floor and all work shall be done as per the instructions of the Engineer-in-Charge.25.000M
7th Apr, 2026

4 Days Left

WhatsApp