Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4659964
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Provision Of 01 Approach Road/path And Addition /alteration To Existing Periphery Road Around Type-ii And Type-iii Md Accomodation At Icgs Mundra Under Ge(i) (cg) Gandhinagar
Last Date For Submission18th Jul, 2026
Opening Date20 Jul, 2026
Cost
Document Cost500.00
EMD87000.00
Estimated Cost4342000.00
Location
CityGandhinagar
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30cm upto1.5m in depth, exceeding 1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 mtr complete all as specified and as directed.72.00CUBIC METRE
2M&L for Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm, n exc 50 mm deep etc complete all as specified and directed.163.00TEN SQUARE METRE
3M&L for Rolling and consolidating formation surfaces in cutting with 8 to 12 tonne roller in soft/loose soil complete all as specified and as directed.21.90TEN SQUARE METRE
4M&L for 150mm spread thickness soling (or sub base) with broken boulders or quarried stone, interstices filled, surface formed and rolled and consolidated to required gradient and camber complete all as specified and as directed.21.90TEN SQUARE METRE
5Providing and Laying Dry lean Concrete (DLC) 75 mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa Minimum cement content not less than 140 Kg/Cum, DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting usign high amplitude tamping bars paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc complete all as specified and tolerances to be as per Table 900-1 of MaRTH specifications for ROad and Bridge Work 2013 complete all as specified and as directed.185.00TEN SQUARE METRE
18th Jul, 2026

7 Days Left

WhatsApp