Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4100022 |
|---|---|
| Organisation Name | Directorate General Of Lighthouses And Lightships |
| Tender Brief | Corrigendum : Provision Of Generator Shed At Kavaratti Lighthouse |
| Last Date For Submission | 26th May, 2026 |
| Opening Date | 27 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 17924.00 |
| Estimated Cost | 896216.00 |
| City | Gandhinagar |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas ( not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides,ramming of bottom and getting out and disposal of excavated earth lift upto 1.5 m, including cost of all materials, labour, tools & plants etc complete as directed by Engineer-in-charge , | 6.00 | Cum |
| 2 | Providing and laying cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in foundation and plinth including cost of all material, tools & plants, labours, laying, compacting, curing etc. complete as directed by the engineer in charge | 3.00 | Cum |
| 3 | Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, including cost of all materials, labour, tools & plants, etc complete as directed by Engineer-in-charge . | 4.00 | Cum |
| 4 | Reinforced cement concrete work in foundations & up to plinth level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost of all materials, labour, tools & plants, etc complete as directed . | 1.50 | Cum |
| 5 | Steel reinforcement for RCC work including straightening,cutting,bending and placing in position and binding with Thermo-Mechanically Treated (TMT) bars of grade Fe-500D or more conforming to relavent ISI specifications inluding supply of all cost of all materials labour, tools and plants etc complete as directed. | 120.00 | Kg |