| Tender ID | 4313350 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To Sewage Line, Septic Tanks, Manholes, Drains, Cleaning Of Sewage Line In Wing-i, Ii, Iv And V At Arty Centre Under Ge Nrc |
| Last Date For Submission | 13th Jun, 2026 |
| Opening Date | 15 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 5000000.00 |
| City | Gandhinagar |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavating in trenches, n exc 1.5 m wide and n exe 1.5 m in depth for foundation, shafts, wells, cesspits, manholes, pier holes, etc. n.exc 10 sqm on plan and getting out in hard /dense soil. | 1107.00 | CUM |
| 2 | Excavating in trenches, n exc 1.5 m wide and depth exc 1.5 m but n. exc 3.0 m for foundation, shafts, wells, cesspits, manholes, pier holes, etc. n.exc 10sq m on plan and getting out in hard /dense soil. Note for item No 1 & 2: i) Excavation to be carried out manually and very carefully without any damage to the existing underground cables/GI pipe line/OFC cable any other existing assests. Before starting the work on ground obtaining layout of cable/OFC/GI pipe line etc shall be responsibility of the contractor. ii) Any damage to the existing assets shall be made good by the contractor without any extra cost to the department within 24 hours of occurng of incident. Delay beyond 24 hours Rs 1000 per day (till restoration of services) shall be recovered from the contractors bills. iii) Excavation in bituminous road and making good same with PCC 1:2:4 to the satisfaction of ground executives shall be included in rate quoted and nothing extra shall be paid. | 20.00 | CUM |
| 3 | Excavation over area not exc 1.5 m deep and getting out hard/dence soil comple all as specified. | 9.00 | CUM |
| 4 | Returning, filling in, includings spreading, levelling, watering and well ramming in layers (hard/dense soil) not exc 25 cm each layer complete all as specified and direted. | 677.00 | CUM |
| 5 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point. | 450.00 | CUM |