| Tender ID | 5002881 |
|---|---|
| Organisation Name | Directorate General Of Lighthouses And Lightships |
| Tender Brief | Corrigendum : Special Repairs And Maintenance Of Lighthouse Tower And Reconstruction Of Powerhouse Building At Thangassery Point Lighthouse |
| Last Date For Submission | 18th Aug, 2026 |
| Opening Date | 19 Aug, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 172320.00 |
| Estimated Cost | 8615981.00 |
| City | Gandhinagar |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART -A- POWER HOUSE BUILDING - Dismantling doors, windows and clerestory windows (steel or wood) shutter (Of area 3 sq. metres and below) including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead including cost of all material, labour, tools & plants etc complete. | 13.00 | each |
| 2 | Taking out existing wooden door / window shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge.etc cost of all materials labour, tools and plants etc complete as directed. | 13.00 | Each |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.etc cost of all materials labour, tools and plants etc complete as directed. | 26.09 | Cum |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar etc cost of all materials labour, tools and plants,scaffolding etc complete as directed. | 54.30 | Cum |
| 5 | Earth work in excavation in all kind of soil by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 11.90 | Cum |