Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4875534 |
|---|---|
| Organisation Name | Roads And Buildings Department |
| Tender Brief | Widening Of Indira Bridge On Sabarmati River At Gandhinagar - Koba - Aerodrum Road. (construction Of New Cable Stayed Bridge On Both Side) |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 18000.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 932348694.44 |
| City | Gandhinagar |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road, land including uprooting rank vegetation grass bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials (C) By mechanical means in area of light jungle | 1.400 | Hectare |
| 2 | Carry out complete alignment survey work by total station along bridge alignment, cross roads 150m. both sides, 500m. additional length from both ends of bridge including marking of centre line of alignment, taking ground level details of existing structures/Bridge, details of all manholes, catchpits, existing utility services, light poles, trees, over head electrical lines, BSNL section pillar/ box, Torrent electrical boxes, PMT including number marked on them, road dividers, foot paths, etc. within construction area and additional areas/ lengths if required. Rate includes fixing necessary reference pillars, establishing bench mark, establishing foundation layout on ground, including submission longitudinal section, cross section and drawing report of survey work in three hard colour copies with soft copy in CD to Engineer-in-charge as directed for flyover and approaches. Submission of drawing in hard copy and AutoCAD soft copy as per specification. | 1.400 | Km |
| 3 | Carryout soil investigation work including drilling 150 mm dia boreholes in all sorts of soil, ordinary rock and hard rock, upto maximum depth as mentioned, collecting undisturbed samples and conducting standard penetration tests alternate at an interval of 1.5 to 2.0 m. depth, conducting necessary laboratory tests for all type of classification and determination of soil parameters like density, shear and consolidation parameters if required, including submission of report in three copies covering investigation data and recommendation for SBC and the pile capacity considering the design criteria, all as per specification. Agency for soil investigation work shall be suggested by Engineer in charge.1) The rate is inclusive of submitting soil investigation report in three sets in hard copy as well soft copies.2)The rate is inclusive of all materials with contractor's labour, tools and plants, machineries, as required.3) The rate is inclusive of all taxes including services tax.For up to Require depth | 160.000 | Rmt |
| 4 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. (1) Beyond 30 cm girth upto and including 60 cm girth (2) Beyond 60 cm girth upto and including 120 cm girth (3) Beyond 120 cm girth upto and including 240 cm girth (4) Above 240 cm girth | 50.000 | Nos |
| 5 | Demolition and disposal of unserviceable materials with all lead and lift.(i) Unreinforced Concrete | 1626.000 | Cum |
13 Days Left