Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4986214 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Omprehensive Maintenance And Certain Br And Em Repair Work Of Jco Ors Md Accn Building No P-76 (01 To 06), J-35-01 And 03 At Dst Enclave And Others Buildings In The Aor Of Age Br-i Under Ge (a) Suratgarh At Suratgarh Mil Stn |
| Last Date For Submission | 10th Aug, 2026 |
| Opening Date | 12 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Ganganagar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Notes:- (i) 100 percent nonperishable items of the work shall be deposited by the L1 bidder within 30 days after placing of work order. (ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE. (iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge. (iv) The unserviceable material obtained under the schedule of credit shall be handed over to the contractor by the Engineer-in-Charge on a proper gate pass. (v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern OEM / authorised dealers and submitted to Accepting Officer,in such case the L1 bidder may be incorporated Group-X category makes as approved by HQ CE SWC Jaipur and HQ CE BTZ in the works after prior approval of Accepting Officer. (vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR s and Final Bill. (vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work. (viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. (ix) If a bidder observes any item in the BOQ that appears to be "Freakishly Low" or technically not required for execution at the site, the bidder must submit written comments to the Accepting Officer during the pre-tender stage or at least 07 days before the Bid Submission Start Date. (x) Any act by the contractor that is found to be against the interest of the Department,or commits misconduct or any complaint received through proper channels and supported by verifiable proof (e.g., fraudulent vouchers, negligence in execution, or attempt to cause undue benefit), shall be treated as a willful default.Such defaults shall render the contractor liable for an Adverse Remark ("NO") in the Quarterly Work Load Return (WLR), barring the firm and its related/sister concerns from participating in further tenders. | ||
| 2 | M&L for 50mm thick PCC 1:3:6 type B-1, using 20mm graded stone aggregate as in plinth protection, laid in slope in 1:30 in pannels n. exc. 2m long including demolition of unreinforced cement concrete in ground floors and paving n.exc 15cm thickness(below or above ground level),complete all as specified and directed by Engineer-in-Charge. | 59.65 | Sqm |
| 3 | M&L for TMT bars 6 to 8mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with the including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed | 280.00 | KG |
| 4 | M&L for form work to soffits of suspended slabs such as roof slabs etc for rough finished concrete surface complete all as specified and directed. | 14.80 | Sqm |
| 5 | M&L for form work to SIdes for slabs and SIdes of RCC/PCC bands in walls, horizontal or sloping and SImilar work exc 10 cm but n exc 20 cm wide for fair finished concrete surface complete all as specified and directed. | 14.80 | RM |
10 Days Left