Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5003069 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair For Replacement Of Ber Equipment Of Old Pump House At Lalgarh Jattan Mil Stn Under Ge Lalgarh Jattan |
| Last Date For Submission | 8th Aug, 2026 |
| Opening Date | 10 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 82700.00 |
| Estimated Cost | 4133340.00 |
| City | Gangdhar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, install, testing & commissioning of Monoblock pump set suitable for 415 V ,3 phase system having capacity 5 HP including PCC foundation for pump & taking down old U/S pump & deposited to E/M store all as specified & directed by Engineer-in-charge. | 4.00 | Each |
| 2 | Supply, install, testing & commissioning of Monoblock pump set suitable for 415 V ,3 phase system having capacity 10 HP including PCC foundation for pump taking down old U/S pump & deposited to E/M store all as specified & directed by Engineer-in-charge. | 4.00 | Each |
| 3 | Supply, install, testing & commissioning of Pumping sets, centrifugal, electric driven of capacity 20 WHP complete including PCC foundation as specified by the manufacturer & including taking down old U/S pump set & deposited to E/M store all as specified & directed by Engineer-in-charge. | 2.00 | Each |
| 4 | Supply install testing & commissioning air blower NGEF coupled with 10 HP induction motor 1440 rpm, 415 V, with rotary pump 640 LPM and blower of cap 230 CFM pressure rating 3.5 Kg/Sqcm including PCC foundation for blower & taking down old U/S compressor including motor & deposited to E/M store all as specified & directed by Engineer-in-charge. | 2.00 | Each |
| 5 | Supply, install, testing and commissioning 75 HP induction motor 4 pole 1500 rpm, ambient temperature 50 degree C, TEFC, class 'F' insulation, IP 55 protection, continous rated (S1 duty with bare shaft & key as per IS: 12615/IEC: 60034-1 suitabble for connecting with existing 75 HP pumping set including taking down old U/S motor & deposited to E/M store all as specified & directed by Engineer-in-charge. | 2.00 | Each |
9 Days Left