Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4125625 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Construction Of V.r Bridge Over Kitna Morawali Drain At Rd 500 In Village Kitna, Tehsil Garhshankar, District Hoshiarpur |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 11 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 59000.00 |
| Estimated Cost | 2933000.00 |
| City | Garhshankar |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation of structure as per drawing and technical specifications including setting out construction of shoring and bracing removing of stumps and other deletenous matter dressing of side and bottom and back lifting with approved material Up to 3 mtr. Depth | 115.50 | cum |
| 2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mixed using with batch plat, trnsist mixer and concrete pump including supply, carriage laoding and unloading of material from an approved quarry complete as per Drawing and Technical Specifications,placed in foundation and compacted by vibration including curing for 14 days. | 8.91 | cum |
| 3 | Providing and Laying Plain Cement Concrete M-15 in Foundation PCC using with batch plat, trnsist mixer and concrete pump including supply, carriage laoding and unloading of material from an approved quarry complete as per Drawing and Technical Specifications. | 17.00 | cum |
| 4 | Providing and Laying Plain Cement Concrete M-25 in Foundation and plinth using with batch plat, trnsist mixer and concrete pump including supply, carriage laoding and unloading of material from an approved quarry complete as per Drawing and Technical Specifications. | 20.04 | cum |
| 5 | Providing and Laying RCC Grade M-30 in foundation and plinth Using batching plant, transit mixer and concrete pump including supply , carriage, loading and unloading of Material from an approved quarry complete as per drawing and technical specification. | 36.69 | cum |
2 Days Left