Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4021936 |
|---|---|
| Organisation Name | Rural Works Department |
| Tender Brief | Corrigendum : Construction Of 02 Classrooms And 01 Headmaster Room At Government Primary School Dobri In Thalisain Development Block Pauri Garhwal District. |
| Last Date For Submission | 13th May, 2026 |
| Opening Date | 14 May, 2026 |
| Document Cost | 2950.00 |
|---|---|
| EMD | 75000.00 |
| Estimated Cost | 0.00 |
| City | Garhwal |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (HydraulicExcavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or10 sqm on plan)including dressing of sides and ramming of bottoms, lift upto 1.5m, including gettingout the excavated soil and disposal of surplus excavated soil asdirected, within a leadof 50 m,all kinds of soil. | 69.42 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 13.91 | Cum |
| 3 | Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) | 12.86 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 19.05 | Cum |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 28.57 | Cum |
19 Days Left