| Tender ID | 4277969 |
|---|---|
| Organisation Name | Yamuna Expressway Industrial Development Authority |
| Tender Brief | Construction Of C.c Road And Interlocking Tiles Works In Village -kherli Bhav ,yea Wc-06 |
| Last Date For Submission | 26th May, 2026 |
| Opening Date | 28 May, 2026 |
| Document Cost | 2545.00 |
|---|---|
| EMD | 272450.00 |
| Estimated Cost | 13622477.00 |
| City | Gautam Budnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, withen a lead of 50m. Depth From 0.0 to 1.5 M below G.L. | 1090.00 | Cum |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 88.09 | Cum |
| 3 | M-150 brick work in 1:4 cement and coarse sand of ( 2.2 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . | 65.46 | Cum |
| 4 | concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17 | 21.25 | Cum |
| 5 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm,mixed a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needie, screed and plate vibrators and| finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including all taxes, material, T&P, Machinary. royalty, labour cess all taxes complete. Excluding GST as per E/l. | 343.535 | Cum |
Closed