Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Yamuna Expressway Industrial Development Authority
Tender ID4525960
Organisation NameYamuna Expressway Industrial Development Authority
Tender BriefCorrigendum : Construction Of 11/0.415kv Sub-station (03nos) In Sector-24a Yeida
Last Date For Submission23rd Jun, 2026
Opening Date25 Jun, 2026
Cost
Document Cost6415.00
EMD930000.00
Estimated Cost46455355.00
Location
CityGautam Budnagar
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Bill of Quantity -A (Electrical Part)Supply, Installations, Testing & Commissioning of 11kV HT PANELS Indoor type 4 panel board, 2 I/C and 2 O/G ( 1 T/F + 1 spare ) 630 Amps, 11 KV, 3 phase, 25 KA for 1 sec. Vacuum circuit breaker including two bus PT with all necessary protection, metering and other accessories complete in all respect.as per the directions of the Engineer-in-charge. YEIDA SOR-673.00Nos.
2Supply, delivery, assembly, installation, testing and commissioning of Out door type distribution transformer. 11/0.433 KV, 3 Phase, Double wound winding. Voltage ratio 11000/433-250 Volts, vector group Dyn 11. Air cooled with manually operated +5% and +10% off load Tap changer and complete with standard fitting & accessories as given in the specification and also confirming to IS : 1180 (Level-II) with first filling of the oil complete as required. (This includes oil testing for dielectric strength, flask over test and filtration of transformer oil to be conducted in the event of unsatisfactory results of oil testing. (Crompton, NGEF, Alstom, BHEL, Voltamp, Diamond, Reychem, Kanohar make) complete in all respect.as per the directions of the Engineer-in-charge. YEIDA SOR-74 Copper wound. (a) 630 KVA3.00Nos.
3Supply & Fixing of Main LT & APFC Consisting One Incoming 1000A,4P ACB EDO Type and 6 Nos Outgoing (5 No 400A TPN MCCB and 1 Nos 63A TPN MCCB ) with digital metering & Indicating lamps and Capacitor bank 250KVAR for APFC Panel Board & along with other accessories as required.complete in all respect.as per the directions of the Engineer-in-charge. YEIDA SOR-6812.00Nos.
4Supplying, Assembling, Installation, Commissioning of Sealed maintenance free (SMF) 110V D.C., 150 AH batteries. The batteries shall rest on treated wooden planks fabricated from MS angle and free standing floor mounted rack with acid resistant finish and complete with series connecting electrical leads and charging of batteries. The batteries shall be accompanied with tester. This shall have incoming leads as well as outgoing leads and of suitable battery charger for 8 hrs charge of 150AH battery charger enclosed in sheet metal with fan on top and it should automatically charge the batteries With booster and trickle charge. Charger shall be complete with incoming & outgoing leads and D.C. Distribution board will have one set of 63 amps MCB as incomer and ten number of suitable rated MCB (as per coil rating of VCB) on outgoing side enclosed in metal sheet enclosure of 2mm thick and suitably painted. The unit will be complete with bus bars, accessories, links, terminal strip, clamps etc along with cables up to incoming & outgoing to VCB panels.complete in all respect.as per the directions of the Engineer-in-charge. YEIDA SOR-693.00Nos.
5Supply, delivery, laying testing & commissioning of 11KV (E), XLPE cable having compacted circular staranded aluminium conductor, conductor screening of extruded semi conducting compound, cross linked polythylane (XLPE), insulation screening of the extruded semi conducting compound followed by copper tape, cores laid up, taped PVC inner sheath, single layer of steel strip armouring, overall PVC outer sheath conforming to IS: 7098 (Part-amendments) for following mentioned sizes. It should be operational at 11 KV, 50 Hz. AC system in ground at a depth of 1200 mm below ground level over a cushion of 75 mm thick sand alround and protected with bricks on sides and top on surface the cable run shall be fixed on M.S. clamps etc of suitable size or as directed by the E/I. Complete in all respect. The price are inclusive of all earth work such as digging, back filling, supply & spreading of good earth all around the cable, supply & providing cable identification markers. The installation should be complete in all respects and as per requirement of the job. (CCI , Fort Gloster , Asian, Universal , Nicco , ICL , Diamond, Havells, KEI make11kV, 3C X 120 sq. mm. (Cable form 11/0.415kV Sub-stations to 630kVA, 11/0.415kV Transformers) PWD-2018 PS No-50690.00Mtrs.
23rd Jun, 2026