| Tender ID | 4565766 |
|---|---|
| Organisation Name | Yamuna Expressway Industrial Development Authority |
| Tender Brief | Corrigendum : Construction Of Chabutra And Shed For Shamshan Ghat In Village - Jaitpur At Khasra No 257 Yea Wc-06 |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 840.00 |
|---|---|
| EMD | 36900.00 |
| Estimated Cost | 1841316.00 |
| City | Gautam Budnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply of Earth work , banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 UPPWD SOR-2020DSR-16/16.1 | 585.0000 | Cum |
| 2 | Providing and laying 80mm I.S.I. Mark factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction of approved size degine, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming to IS- 15658 and IRC: SP:63. | 171.0000 | Sqm |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Morth-401 | 26.3300 | Cum |
| 4 | Cleaning jungle including uprooting of rank vegetation grass brush wood , trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to adisance of 50 m out sides | 375.0000 | sqm |
| 5 | Earth work in excavation in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom. Lifts upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | 86.7600 | Cum |
6 Days Left