| Tender ID | 4553096 |
|---|---|
| Organisation Name | Yamuna Expressway Industrial Development Authority |
| Tender Brief | Corrigendum : Construction Of Chabutra With Shed And Approach Road For Shamsan Ghat In Village- Mukimpur Sivara, Yea . Wc-06 |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 840.00 |
|---|---|
| EMD | 23900.00 |
| Estimated Cost | 1191779.00 |
| City | Gautam Budnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m aboveground level and removal of rubbish up to distance of 50m out side the periphery of the area cleared DAR-18/2.31 | 225.00 | sqm |
| 2 | Item code morth 301 Excavtion in soil using hydraulics excavator and tippers with disposal upto 1000 meters. Excavation for road work in soil with hydraulics excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance witrequiremements of lines , grades and cross section and transportation to the embankment location within all lifts and lead upto 1000 meters | 77.04 | sqm |
| 3 | Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 | 465.34 | Cum |
| 4 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work -UPPWD SOR /281/P-17 | 5.04 | Cum |
| 5 | M-150 brick work in 1:4 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work UPPWD SOR 303 Same as item no 305 but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a | 20.82 | Cum |