Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4565790 |
|---|---|
| Organisation Name | Yamuna Expressway Industrial Development Authority |
| Tender Brief | Corrigendum : Providing And Fixing Open Gym Equipment For Play Ground And Construction Of Boundary Wall School Campus In Village - Deorar, Yea Wc-06 |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 1880.00 |
|---|---|
| EMD | 140000.00 |
| Estimated Cost | 6991533.00 |
| City | Gautam Budnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom.Lifts up to 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50m. (MOST/A.R./YEIDA) | 218.98 | Cum |
| 2 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all material, Labour, Tools&plants etc required for proper completion of the work. | 22.43 | Cum |
| 3 | B/W with bricks of class 150 in foundation & plinth in CM 1:4 (Based on UP PWD SOR 2020) Cement mortar 1:4 ( 1cement :4Coarse sand) | 89.59 | Cum |
| 4 | M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar superstructure but for walls of half brick thick including supply of all material, labour, T&P etc. required for proper completion of the work. (UPPWD/SOR-2020/305(a)+310A | 61.45 | Cum |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 68.04 | Cum |
6 Days Left