| Tender Brief | Corrigendum : Providing And Fixing Solar Pump Construction Of One Room Pumping Out Of Water Pond To Gull And Interlocking Tiles Work In Village-khwajpur, Yea. Wc-06 |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 840.00 |
|---|---|
| EMD | 38000.00 |
| Estimated Cost | 1898365.00 |
| City | Gautam Budnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, withen a lead of 50m. Depth From 0.0 to 1.5 M below G.L. | 846.00 | Cum |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 1.20 | Cum |
| 3 | M-150 brick work in 1:4 cement and coarse sand of ( 2.2 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . | 26.07 | Cum |
| 4 | M-150 brick work in 1:4 cement and coarse sand of ( 2.2 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . | 9.66 | Cum |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level DAR 18/5.33.1/P-241 | 0.62 | Cum |