| Tender ID | 4241651 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Janpad Kanpur Nagar Me Alpika Agapur Ke Km 0.503, 1.222, 2.243, 2.862, 3.728 Evam 4.749 Par Chatigrast Pulo Ke Punarnirman Ka Karya |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 2800.00 |
|---|---|
| EMD | 170000.00 |
| Estimated Cost | 8500000.00 |
| City | Ghatampur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the structure for Canal VRB, DRB, PRB and other hydraulic structures as per directed by Engineer in charge. | 345.46 | Cum |
| 2 | Providing & Laying in position cement concrete of specified grade excluding the cost of centering and shuttering in ratio 1:3:6 (1 cement: 3 coarse sand : 6 graded size 20-40mm nominal size) including all labour, material and T&P and royalty for proper completion of work as per directed by Engineer-in -Charge. | 115.10 | Cum |
| 3 | Providing & Laying reinforced cement concrete of specified grade excluding the cost of steel reinforcement, centering and shuttering in ratio 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded size 20mm nominal size) including all cost of labour, material and T&P and royalty for proper completion of work as per direction of Engineer-in-Charge. | 436.37 | Cum |
| 4 | Centering and shuttering of R.C.C. Work including rent of shuttering material, labour and T&P etc. required for proper completion of work for slab, lintels, sun shads, column & wall etc. | 1068.54 | Sq m |
| 5 | Providing Steel reinforcement for RCC work including straightening, cutting, bending, binding and placing in position including cost of wires, steel, labour and T&P etc. complete for proper completion of work . | 15.72 | MT |