Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3996889 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Beautification Work Under Rajnagar X0 Flyover. |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 23548.00 |
|---|---|
| EMD | 534600.00 |
| Estimated Cost | 17820000.00 |
| City | Ghaziabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). | 30.30 | CUM |
| 2 | Desposal ofdismantled RCC / malba material lead up to 8 km distance including loading un loading etc etc all completed as per the direction of engineer - in - charge. | 30.56 | CUM |
| 3 | Excavation in foundation in cutting ordinary soil including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 | 29.34 | CUM |
| 4 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications anddirections of Engineer-in-Charge. | 73.18 | CUM |
| 5 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 48.89 | SQM |
16 Days Left