Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4073303 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Construction Work In Npp Loni Work No 1 |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 3186.00 |
|---|---|
| EMD | 269596.00 |
| Estimated Cost | 2695963.00 |
| City | Ghaziabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | E/W in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not be exceeding 0.50 m in depth and earth work in embankment to be in 20 cm. Layers including ramming and dressing the surface to required levels and slop and also including 1.5 m. lift and up to 8 km .SI NO. 253A+261B+231B | 606.37 | CUM |
| 2 | P.C.C.(1:6:12) cement fine sand and brick Ballast 4cm in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 273 | 19.80 | CUM |
| 3 | Supplying, fiting and placing HYSD bar reinforcement in Foundation Complete as per Drawing and technical specifications Clause 1000 and 1202 | 26.64 | QTL |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4") guage approved stone ballast in proportions of 1:1.5:3 in R.C.C,SLAB excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 284 new item slab | 48.48 | CUM |
| 5 | Collection and consolidation of WBM top coat with 22.4 -53mm gauge stone ballast including supply of stone ballast of approved quarry, royalty.carriage uplo site loading unloading stacking, testing charges, trade tax and other taxes, octroi levies to and also including opening out stacks spreading stone ballast to required cambor and template and making mendies to retain water and also all leads and lifts, water charges,watering and compacting with 8-10 tonne smooth wheeled road roller, including all hire fuel charges of the roller and blinding with Type B screening materials required for propor completion of work. Including all material, labour, T&P, taxes, labour coss etc. complete as per direction of Engineer in charge but excluding GST (mord 405) | 80.85 | CUM |
6 Days Left