Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Ghaziabad Development Authority
Tender ID4185937
Organisation NameGhaziabad Development Authority
Tender BriefCorrigendum : Construction Of Pathway And Toilet With Interlocking Tiles Under Public Facilities In The Government Funded And Management Committee Run Navjeevan Inter College, Farukhnagar Campus.
Last Date For Submission25th May, 2026
Opening Date28 May, 2026
Cost
Document Cost3009.00
EMD80600.00
Estimated Cost4029754.00
Location
CityGhaziabad
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Toilet (Part-A) E/W Excavation in ordinary soil (Loam, clay or sand )including lift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or in to the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer -in -charge upto a distance of 30 m from the foundation trenches. DSR 2023 SI no-2.8.136.00Cum
2Concrete with 4cm guage stone ballast coarse sand of 2.20 FM and cement in proportion of 8:4:1 including supply of all materials , labour , T&P etc. required for proper completion of the work.(DSR/23 4.1.8)13.50Cum
3Brick work with common burt clay FPS (non modular) bricks of class designation 7.5 in foundation and plinth in : 1:6. .DSR/23 6.1.218.00Cum
4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources).((DSR/23 5.1.2) 3.00Cum
5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(DSR/23 5.2.2) 10.00Cum
25th May, 2026

4 Days Left

WhatsApp