Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4315425 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Corrigendum : Construction Work Of Boundary Wall Of Manauli Chhajjupur Crematorium. |
| Last Date For Submission | 11th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2443500.00 |
| City | Ghaziabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in Excavation by mechanical means hydraulic Excavator)/manual means over areas in foundation( not exceeding 1.50m. in width or 10 sqm on plan) including dressing of sides and rammingof bottoms, lift upto 1.50 m. including getting out the excavated soil and disposal of lift up to 1.50 m and lead up to 30 M. and including filling watering and ramming of excavated of surplus earth as per directed, within a lead of 50m. all kind of soil as per DSR-2023 S.I.No.2.8.1. | 84.48 | cum |
| 2 | Providing and laying in position cement concrete of specificed grade excluding the cost of centering and shuttering in foundation in 1:4:8 (with cement, coarse sand & graded stone aggregate nominal 40mm size) of including supply of all materials, labour. Tools& plants etc. required for proper completion of work. as per DSR-2023 S.I.No.4.1.8. | 9.18 | cum |
| 3 | Brick work with common burnt clay selected F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in cement mortar 1:4 (1 cement:4coarse sand). as per DSR-2023 S.I.No.6.1.1 | 66.25 | cum |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources).as per DSR-2023 S.I.No.5.3. | 31.63 | cum |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings,bases of column.etc as per DSR-2023 S.I.No.5.9.1. | 77.45 | Sqm |
5 Days Left