Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4450636 |
|---|---|
| Organisation Name | Purvanchal Vidyut Vitaran Nigam Limited |
| Tender Brief | Construction Of Boundarywall At 33/11 K.v. S/s-rauza, Distt-ghazipur. |
| Last Date For Submission | 17th Jun, 2026 |
| Opening Date | 18 Jun, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 6500.00 |
| Estimated Cost | 315060.00 |
| City | Ghazipur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 3.40 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 0.95 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 1.50 | Cum |
| 4 | FORM WORK:- Centering and shuttering including strutting, propping etc. and removal of form for,Foundations, footings, bases of columns, etc. for mass concrete . | 60.25 | Sqm |
| 5 | Construction of boundary wall with Precast Column and Pannel (with prestressed concrete , pannel size-2100x300x50mm and column size 150x150x2400mm ,1800 mm. above and 600mm. below ground level) including fixing of pannel & column in proper alignment including cost of all material labour and T&P etc. required for proper complection of work as per direction of engineer incharge . (C.C. for grouting, excavation of pit and P.C.C. shall be paid extra) . (NSI). | 90.00 | Sqm |
17 Days Left