| Tender ID | 3886589 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction of Dildarnagar Zamaniya Road To Fulli Vidhut Substation Link Road |
| Last Date For Submission | 6th Apr, 2026 |
| Opening Date | 06 Apr, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 895000.00 |
| Estimated Cost | 13900000.00 |
| City | Ghazipur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from R.O.W. with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 ( Including all material & T&P etc. complete. & Excluding cost of GST) | 10050.000 | Cum |
| 2 | Construction of granular sub-base by providing close graded material , spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavator at OMC , and compacting with vibratory rollar to achieve the desired density , complete as per clause 401 ( Including all material & T&P etc. complete. & Excluding cost of GST) | 1265.625 | Cum |
| 3 | Providng & laying , spreading and compacting stone aggregates of specific sizes (45-63mm S.S.B.) to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 KN in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 2 as per Technical Specification Clause 405. ( Including all material & T&P etc. complete. & Excluding cost of GST) | 703.125 | Cum |
| 4 | Providng & laying , spreading and compacting stone aggregates of specific sizes (22.4-53 mm S.S.B) .to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 KN in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 3 as per Technical Specification Clause 405.. ( Including all material & T&P etc. complete. & Excluding cost of GST) | 703.125 | Cum |
| 5 | Brick edging on both side of the road with 1st class bricks laid on edge with mud mortar including Cost of all labour materials T&P etc . Complete. ( Including all material & T&P etc. complete. & Excluding cost of GST) | 2.500 | Km. |