Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4779101 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Addition Alteration Of Warehouses At Cgasd Goa Under Ge (i) )cg) Goa |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 03 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 39800.00 |
| Estimated Cost | 1990000.00 |
| City | Goa |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | B/R Works Demolition of concrete in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) in any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 32.91 | CUBIC METRE |
| 2 | Material and labour for Portland cement concrete design mix with 12.5mm graded aggregate of grade M30 complete all as specified and as directed. | 32.91 | CUBIC METRE |
| 3 | Material and Labour for machine cut kota stone slab flooring 20-25 mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete and including 20 mm thick screed bed or bedding layer in cement mortar 1:4 complete all as specified and as directed Note: Cement screed bed shall be measured and paid separately | 200.76 | SQUARE METRE |
| 4 | Material and labour for kota stone slab 20-25 mm thick in riser of steps, skirting, dado and pillar laid over cement rendering of 10mm in cement mortar (1:6) complete all as specified and as directed. | 13.12 | SQUARE METRE |
| 5 | Material and labour for taking down cement plaster of any description on brick/stone or concrete surface including racking out joints, hacking for key, scrubbing down with water to receive plaster and dubbing out average 15mm thick in cement mortar 1:6 on irregular face of walls (when specifically ordered in writing) including removing debris/rubbish materials off the site all as specified and as directed. | 576.76 | SQUARE METRE |
6 Days Left