| 1 | Attending complaints of leaking/unserviceable pillar cocks, wall mixers, WHB mixers, bib taps, two-way bib taps, stop valves, angle cocks, etc. of 15 mm to 20 mm dia and making the same fully functional and leak-proof, including taking down carefully, dismantling, servicing, refixing and replacing minor unserviceable parts such as rubber washers, leather washers, brass jumpers and other similar consumable components of suitable size, complete all as specified and directed by the Engineer-in-Charge.
| 100 | Each |
| 2 | Note: The quoted rate shall be deemed to include cost of all labour, tools & plants, minor spare parts, consumables, thread, PTFE tape, sealing materials and other incidental items required for satisfactory repair and functioning of fittings. However, major replacement parts such as spindle/headgear assemblies, cartridges/phases of CP pillar cocks, wall mixers, WHB mixers, two-way bib taps, CP bib cocks, angle cocks, etc., if replaced, shall be measured and paid for separately under respective items. | | |
| 3 | Attending complaints of leaking/unserviceable low level flushing cisterns of PVC or chinaware type and making the same fully functional and leak-proof, including taking down carefully, dismantling, servicing, refixing and replacing defective/minor unserviceable parts such as rubber washers, PVC levers, PVC/CP knobs and other similar consumable components, if required, complete all as specified and directed by the Engineer-in-Charge.
Note:The quoted rate shall be deemed to include cost of all labour, tools & plants, minor spare parts, consumables, thread, PTFE tape, sealing materials and all other incidental items required for satisfactory repair and functioning of the flushing cistern complete. | 30 | Each |
| 4 | Attending complaints of internal water supply pipes, fittings and bottle traps for removal of blockages, leakages, air locks, deterioration of concealed/exposed pipes and fittings, and other defects of any description, including clearing of choke/air lock by pressure pump or any other suitable means, taking down carefully and refixing of pipes and fittings, and replacing old/unserviceable pipes and fittings with new ones wherever required, complete all as specified and directed by the Engineer-in-Charge.
The work shall include checking, dismantling, servicing, testing and restoring the water supply system to proper functional condition, including rectification of minor leakage complaints and allied works complete.
Note: The quoted rate shall be deemed to include cost of all labour, tools & plants, consumables, thread, PTFE tape, sealing materials and all incidental charges required for attending complaints and restoration of system. New GI/CPVC/PVC pipes and fittings replaced, if any, shall be measured and paid separately under respective Supply & Fix items of this schedule. This item includes labour component only for removal of blockages, air locks, leakage rectification and associated repair works. | 30 | Each |
| 5 | Checking and Attending to Carpenter work in repairs to Joinery ,(wooden/ steel/aluminium)of iron alumunium mongery , pelmet box ,toughened glass door and partition, door spring ,rooling shutter etc requring carpenter work and carrying out minor repair such as tighting of screw nails ,wire of false celling ,easening of joinery,door spring etc including replacement of glass panes,wire cloth to joinery or any defective items /materials complete all as specified and directed by Engr-in-charges. Note:Cost of tools, plants, spare parts, nails or screws, etc.,. materials shall be deemed included in quoted rates. | 60 | Each |