Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Department
Tender ID4429506
Organisation NameWater Resources Department
Tender BriefCorrigendum : Construction Of Anti-sea Protection Wall/beautification Surrounding Laxmi Narayan Temple At Goenkarwada, In Ward No.11 V.p. Anjuna-caisua In Siolim Constituency.
Last Date For Submission16th Jun, 2026
Opening Date17 Jun, 2026
Cost
Document Cost5000.00
EMD28380.00
Estimated Cost1418601.00
Location
CityGoa
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel moorum of all varities shingles, pebbles, all types of conglomerates, laterite rock, soft rock ordinary or disintegrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc in all conditions such as dry, moist, saturated submerged, foul conditions etc including setting out construction of shoring and bracing removal of stumps and other deleterious material providing barricading, danger lighting, gaurding dressing of sides and bottom & back filling the excavated earth to the extent required and disposing of the surplus excavated/rock as directed by the Engineer in charge etc for all lead and lifts etc as specified and directed etc all complete. : All kinds of soil42.00Cum
2Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.51.00Cum
3Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns146.00Sq.m
4Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level99.00Cum
5Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. : 75 mm dia11.00RM
16th Jun, 2026

6 Days Left

WhatsApp