Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4269484 |
|---|---|
| Organisation Name | Goa Tourism Development Corporation Limited |
| Tender Brief | Corrigendum : Construction Of New State Of Art Printing Press For Department Of Printing And Stationery At Verna Idc Goa |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 30000.00 |
|---|---|
| EMD | 3495853.00 |
| Estimated Cost | 0.00 |
| City | Goa |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | CIVIL WORKS | ||
| 2 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads :Beyond 30 cm and upto 60 cm grith | 7.00 | Each |
| 3 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads : Beyond 60 cm and upto 120 cm girth | 17.00 | Each |
| 4 | Felling trees of girth(measured at a height of 1. m. Above ground level) inluding cutting of trunks and branches removing the roots stacking the serviceable material and disposal of unserviceable material for all leads : Beyond 120 cm and upto 240 cm girth | 5.00 | Each |
| 5 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan )for all leads & lifts in all types of strata comprising of any type of materials either in full or part as the case may be adopting any method/methods as may be convenient as permitted (excluding blasting) in all conditions such as dry, moist, foul, saturated, submerged etc. including dressing of sides, planking and strutting, timbering, ramming of bottom, pumping and bailing out water, barricading, danger lighting, guarding and carting away excess excavated earth at the site identified by the contractor and obtaining all statuatory approvals, as directed by engineer for all lead and all lifts etc complete. | 2296.00 | Cu.m. |
9 Days Left