| 1 | Providing comprehensive Design and Consultancy Services for Reconstruction of Naval Hospital (INHS JEEVANTI) at Vasco-da-gama, Goa. comprising 79 Bedded hospital with all wards and facility in G+3 or G+4 configuration buildings, including preparation of all architectural, structural and services drawings, detailed estimates, and GRIHA compliance documentation, complete in all respects. The building shall be well planned, designed and detailes as per latest norms, energy efficient, ensuring functionality, safety, economy and modern aesthetics, as the facility if already existing for external sevices integration of such facilities and upgradation to new facility is also to consider, all as per the directions of GE/AGE/CENM/E-in-Cs and NHQ complete all as specified and as directed. | 1.00 | EACH JOB |
| 2 | Phase- I (Pre Construction stage) | | |
| 3 | Surveys and Studies: -
Carrying out detailed topographical /contour survey plan including the Marking of contours at every 3 mtrs of intervals on site etc and all ground visible features like building, roads, drain, trees, Electrical poles and other similar permanent features over the different location/areas complete in all respect. The survey to be done by using Electronic Total Station digital instrument or by drone.The consultant shall prepare detailed level sheet and contour plans of the proposed building footprint to be superimposed on the survey showing proposed Plinth level, Floor finish level nearest RL, drain levels, spot levels, and benchmarking details required for design and execution. Preparation of survey drawing and calculation of survey/plot area with traingulation method on computer using Auto CAD or other suitable software including supply of CD and three sets of drawing of appropriate size, preferably on A-1 size complete as per terms and conditions and as directed by Engineer-in-Charge. Architecture consultancy containing Preparation of Concept Plan, Master Plan, and Preliminary Architectural Layouts plans conceptual drawings such as sketch, P&Q of married accomodation,Preparation of site plan, floor plans, elevations and sections, modern front elevation, | | |
| 4 | Soil Investigation: -
Mobilization and demobilization of personnel, tools, and equipment required for the execution of the work, including lodging and boarding expenses, will be carried out. Soil investigation will be conducted in accordance with IS:1892-2021, using manual, hydraulic, or Calyx rotary drilling methods with 50 150 mm diameter, employing casing pipes or bentonite slurry where necessary to support collapsible strata below the water table. 5 nos of Boreholes will be drilled using pot holes or helical augers in all types of soil up to a depth of 15 m, and in soft to hard rock up to the depth of refusal (N > 50), except in soft soil or boulder zones. Standard Penetration Tests (SPT) will be performed and undisturbed samples (UDS) collected at regular intervals. A comprehensive Soil Bearing Capacity (SBC) report will be prepared and submitted, including analytical and graphical representation, detailed calculations, and recommendations on foundation type and design in accordance with codal provisions. The report will be reviewed and vetted by IIT/NIT experts prior to final submission. | | |
| 5 | Demolition Planning:-
Comprehensive assessment, and planning services to ensure safe, compliant, and efficient execution of the demolition. Carry out a detailed reconnaissance survey and preliminary documentation of the existing site, including review of available architectural, structural, and service drawings, and identification of hazardous materials and utilities such as water supply, sewerage, electrical systems, STP, ETP, DG sets, and HVAC networks. Plan safe demolition sequencing, identifying structures requiring special handling such as underground tanks, basements, or adjoining operational facilities. Based on these assessments, a detailed demolition plan shall be prepared, outlining methodology, phasing, and safety measures, and recommending appropriate demolition techniques, manual, mechanical, or hybrid, depending on site conditions. The scope further includes advising on statutory clearances, preparing a Safety, Health, and Environment Plan, and ensuring compliance with the Demolition Waste Management Rules, 2016 (as amended) as well as
preparation of estimates for demolition and safe disposal of waste. | | |