Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4388893 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provision Of Two Wheeler Parking Shed Adjacent To Parade Ground Of Dhq-11 And Provision Of Framed Glazing For Cg Land Under Ge (i) (cg) Goa |
| Last Date For Submission | 20th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 38600.00 |
| Estimated Cost | 1930000.00 |
| City | Goa |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in post holes(similar holes) each not exceeding 0.5 Cum, getting out, soft/disintegrated rock returning, filling in and ramming earth or broken rubble mixed with earth around in layers not exceeding 25cm watering, and removing surplus soil to a distance not exceeding 50m and making good surface complete all as specified and as directed. | 20.00 | EACH |
| 2 | Material and labour for Plain Cement concrete 1:3:6, type C-2 using 40 mm graded stone aggregate as in foundations, filling and mass concrete etc complete all as specified and as directed. | 8.00 | CUBIC METRE |
| 3 | Material and labour for mild steel single stanchions of square hollow section with flange plates, caps, bases, splices, angle brackets, cleats and other connecting accessories conforming to Fe.410-W, Gde-E-250, quality 'A' etc complete all as specified and as directed. | 800.00 | KILOGRAM |
| 4 | Material and labour for mild steel rolled sections as in main and cross beams, hip and jack rafters, purlins where connected to common rafters and running rails and guides for sliding doors fixed with angle cleats or other connecting plates of Fe-290 (Gde E- 165) complete all as specified and directed | 2000.00 | KILOGRAM |
| 5 | Material and labour for applying two coats of synthetic enamel paints over a coat of red oxide primer to new steel surface, not otherwise described, over 10cm width or girth including preparation of new surface complete all as specified and as directed. | 250.00 | SQUARE METRE |
6 Days Left