Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3887909 |
|---|---|
| Organisation Name | Info Tech Corporation Of Goa Limited |
| Tender Brief | Setting Up Of Library On The Second Floor In The Premises Of Goa State Council Of Educational Research And Training (gscert) At Porvorim- Goa |
| Last Date For Submission | 10th Apr, 2026 |
| Opening Date | 13 Apr, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 57714.00 |
| Estimated Cost | 0.00 |
| City | Goa |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | DISMANTLING DEMOLISHING & REPAIRS WORK Crack filler for plasters, IPS, cement sand screeds and non structural cracks. Do Not open the cracks, Clean the cracks so as to free them from oil, dust, loose particles etc. Moisten the surface with water, Fill cracks with EPCO ACR using spatula or a putty knife. While applying avoid formation of cavity or bubbles. After filling , allow the surface to dry for at least 24 hours. Apply in layers at 24 hours interval. If the depth of the crack is more than 10mm. incl. cost of scaffolding transport etc. as per dir of EIC. All the chemicals will be of Krishna Conchem Products Pvt. Ltd. or Equivalent. | 6.50 | Metre |
| 2 | Repairs to plaster in patches of 2.5 sq.m. & under including cutting the patch in proper shape & preparing & plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50m lead, With cement mortar 1:4 (1 cement : 4 fine sand) | 14.50 | Sqm |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 mts. lead. | 4.00 | Sq.m |
| 4 | Dismantling cement asbestos celotex or other ceiling or partition hard broad wall including stacking of serviceable materials and disposal of unserviceable materials within 50 mts. lead. | 78.00 | Sq.m |
| 5 | Dismantling the tile & stone work in all thickness in floors laid in single /multiple layers (ceramic/mosaic/kotha or any other flooring etc) in cement /adhesive as case may be including stacking of dismantled materials within 50 Meters lead etc complete. Note :- Single plan area for (ceramic +misaic + any other flooring) will be considered for payment. | 25.00 | Sq.m |
9 Days Left