Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4047262 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Construction Of Chief Minister Solar Based Lift Irrigation Scheme At Bara Dhanabindi Under Block- Boarijore, District- Godda |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 89500.00 |
| Estimated Cost | 8949220.00 |
| City | Godda |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying Installation and Commissioning charge of Solar Module Mounting (Galvanised Steel) surface structure (for 50 kW) having Hot deep galvanised of Zinc thickness 80micron and as per IS4759 with C Channel $ anti theft with nut bolt of grade SS304,which should also withstand high wind velocity upto 150km/hr or as per MNRE. (Approved Rate vide S.E. M.I. Circle, Deoghar Letter no.-251, dated -28-06-2024) | 50.000 | KW |
| 2 | 50kWp SPV module of 330wP or higher rating, which must have Specification as per IS 14286/IEC 61215 .The module must have to quilify IS/IEC 61730 part I $ II (or having mechanical load test of 5400Pa) for safety purpose.Module to Module wattage mismatch in SPV Array shall be +/-3% and to qualify IEC TS 62804-:2015 for the detection of potential induced degradation and warranted for output wattage not less than 90% in 10yrs and 80% at the end of 25yrs as per MNRE. (Approved Rate vide S.E. M.I. Circle, Deoghar Letter no.-251, dated -28-06-2024) | 50.000 | KW |
| 3 | SPV controller/VFD integrated with GPRS,having MPPT ,Protection IP 65 or above as per MNRE. For 50kW SPV. (Approved Rate vide S.E. M.I. Circle, Deoghar Letter no.-251, dated -28-06-2024) | 5.000 | Nos |
| 4 | Solar cable 4 mm2 used as per IS 694 or as per MNRE. (Approved Rate vide S.E. M.I. Circle, Deoghar Letter no.-251, dated -28-06-2024) | 100.000 | M |
| 5 | copper cable 25 mm2 used as per IS 694 or as per MNRE.(Approved Rate vide S.E. M.I. Circle, Deoghar Letter no.-251, dated -28-06-2024) | 100.000 | M |
8 Days Left