| Tender ID | 4136348 |
|---|---|
| Organisation Name | Urban Development Department |
| Tender Brief | Corrigendum : Repairing Of Brick Drain With Slab From Basuwa Chowk To Radhe Krishn Mandir To New Dharmsala In Ward No 5 And 7 Under Nagar Panchayat Mahagama |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 29959.00 |
| Estimated Cost | 1497926.00 |
| City | Godda |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | E/W in Excavition in foundation trenches in ordinary soil ( vide clafication of soil item - A) and disposal of excavated soil as obtaind to a distance up to 50 M of excavated earth including all lifts leveling, ramming roots of tress, shurbs all comlete as er approved design, building specification and direction of E/I. | 92.58 | EACH |
| 2 | Providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering n layers not exceeding 150 mm thick with all leads and lifts including cost of alll materials labour, royalty and taxes all as per building specification and direction of E/I . | 13.23 | PER M3 |
| 3 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I . | 86.88 | PER M3 |
| 4 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 ( 1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size | 6.61 | M3 |
| 5 | Providing designation 75 B brick work in C.M.(1:6)in foundation and plinth with approved quality of clean coarse sand 0f F.M. 2 to 2.5 including providing 10 mm thick mortar joints ,cost of screening materials , raking out joints to 15 mm depth , curing, taxes and royality all complete as per building specification and direction of E/I. | 43.72 | Per M2 |