Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4077013 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Repair And Renovation Of Minority Kalyan Hostel Abul Kalam Azad Hostel, Parsa Under Block Mahagama District Godda. |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 98000.00 |
| Estimated Cost | 4889302.00 |
| City | Godda |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismentiling old plaster and pointing in cement or lime and raking out joint of 15 mm depth waterring and disposal of unservisable material with all lead as per direction of E/I | 1522.67 | M2 |
| 2 | Providing 12mm thk. Cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per building specification and direction of E/I. | 1249.88 | M2 |
| 3 | Providing & Applying polymer modified, flexible cementatious negative side waterproofing coating with elastic waterproofing polymers on interior wall plaster surface in three coats @14.35 kg /10 sqm. one coat of self priming of cementatious waterproofing polymer(dilution with water in the ratio of 1:1) and two coats of cementatious waterproofing polymer (dilution with water in the ratio of 3:1 ) after scrapping and properly cleaning the surface to remove pre-existing paint film & loose particles till plaster is visible, complete in all respect as per the direction of Engineer-in-Charge. | 362.640 | M2 |
| 4 | Providing 6mm thk. Cement plaster (1:4) in ceiling with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water,scaffolding, taxes and royalty all complete as per builing specification and direction of E/I. | 272.800 | M2 |
| 5 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 27.280 | M3 |
10 Days Left