Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4578045 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair To Certain Road At Grd Kunragath Under Ge (af) Gorakhpur |
| Last Date For Submission | 15th Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 14540.00 |
| Estimated Cost | 727000.00 |
| City | Gorakhpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M &L For Scarifying of picking gravelled macadam or bituminous macadam surfaces in area not exc 400 sqm, not exc 50mm deep 10 Uni 4 complete all as specified and directed | 3.60 | 10 Sqm |
| 2 | M&L for 7.5 cm thick (compacted thickness) WBM, with coarse aggregates granite, trap-or basalt of grading 2 (63 to 40mm size 5 spread, rolled and Compacted with 8 to 10 tons Power roller to achieve gradient and camber as per site required complete all as Sqm specified and directed | 3.60 | 10 Sqm |
| 3 | M&L for preparing unsurfaced WBM surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and 10 Sqr finally fanning the cleaned surface with gunny bags to remove all loose dirt etc, and applying evenly a priming' tack coat with bituminous primer @ 10 kg per 10 sqm of paving bitumen and complete all specified directed at site | 3.60 | 10 Sqm |
| 4 | M&L for preparing black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally tanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a priming/ tack coat with bituminous primer @ Kgs per 10 sqm of paving bitumen complete all specified and directed | 64.10 | 10 Sqm |
| 5 | Premix bituminous macadam laid, rolled and compacted to required gradient and camber using binder (paving bitumen 'Vg 30) with 4% by weight of total mix all as specified (consolidated thickness 75 mm or less) all as specified in particular specifications Note- (i) The quoted rate shall be worked out on the basis of binder contents (bitumen VG-30) of 4% by weight of total mix. (ii) Work shall be executed as per design mix as approved by GE and less bitumen shall be deducted from the quoted rate | 1.98 | Cum |
6 Days Left