| Organisation Name | Uttar Pradesh Power Transmission Corporation Limited |
| Tender Brief | Corrigendum : Work Of Thermal Scanning Of Transmission Lines Through High Resolution Infrared Auto Focus Camara Under Electricity Transmission Circle, Gorakhpur |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 16500.00 |
| Estimated Cost | 1628237.00 |
| City | Gorakhpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Electricity Transmission Division -I, Gorakhpur (Total 664.578 Ckt. Km.) (132 KV Lines - 527.178 Ckt. Km., 220 KV lines - 134.40 Ckt. Km.) | ||
| 2 | Thermal scanning of transmission lines ( 220 KV & 132 KV, Total 664.578 Ckt. Km.) under ETD-I, Gorakhpur by high resolution infrared auto focus camera having minimum resolution of 240*320 using telephoto lenses of 7-14 deg (Min distance 150 meter ) of all section tower of various 400/220/132 KV Lines & its LILO to identify hot point in nut & bolt of tension fitting/dead end jumper cones of all R,Y,B phase including all mid span joints, sleeves and shunts during maximum load conditons once in a year and providing coloured print of report in two sets. Note: Thermo-vision Camera as per technical specifications shall be arranged by the contractor at his own cost. | 664.578 | Ckt. Km. |
| 3 | Electricity Transmission Division - II Gorakhpur (Total 957.28 Ckt. Km.) (132 KV Lines -550.66 Ckt. Km., 220 KV lines - 316.72 Ckt. Km., 400 KV lines- 89.90.0 Ckt. Km.) | ||
| 4 | Thermal scanning of transmission lines (400 KV , 220 KV & 132 KV, Total 957.28 Ckt. Km.) under ETD-II, Gorakhpur by high resolution infrared auto focus camera having minimum resolution of 240*320 using telephoto lenses of 7-14 deg ( Min distance 150 meter ) of all section tower of various 400/220/132 KV Lines & its LILO to identify hot point in nut & bolt of tension fitting/dead end jumper cones of all R,Y,B phase including all mid span joints, sleeves and shunts during maximum load conditons once in a year and providing coloured print of report in two sets. Note: Thermo-vision Camera as per technical specifications shall be arranged by the contractor at his own cost. | 957.28 | Ckt. Km. |
| 5 | Electricity Transmission Division -Deoria (Total 217.958 Ckt. Km.) (132 KV Lines - 182.358 Ckt. Km., 220 KV lines - 35.60 Ckt. Km.) |