Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4392179 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Maint And Repair To Otm Accn In Certain Units Under Age B/r-i At Ge Gurdaspur. |
| Last Date For Submission | 24th Jun, 2026 |
| Opening Date | 01 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Gurdaspur |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of cement concrete of any description and in any position(above/below of ground level) not otherwise specifically provided as in sunken floor, plinth protection, roof kerb, foundation etc. all as specified and directed. | 26.00 | Cum |
| 2 | M&L for 15mm thick rendering with ready mix mortar admixed with integral water proofing compound FOSROC conplast X421IC @ 130ml per bag of cement incl a bonding coat of FOSROC Nitobond AR cement slurry coat (1 vol of Nitobond AR+ 1.5 Vol of water+ 1.5 Vol of cement) complete all as specified. | 110.00 | Sqm |
| 3 | M&L for applying two coats of Nitobond SBR cement slurry (1 Vol of Nitobond SBR+ 1 Vol of water+ 3 Vol of cement) water proofing coating on the entire surface of sunken portion all as specified. | 110.00 | Sqm |
| 4 | M&L for APP based polymeric membrane 3mm thick minimum weighing 3 kg/ Sqm, reinforced with polyster non woven fabric (weight not less than 150 gms/ Sqm) including bitumen primer @ 0.40 kg /Sqm laid on evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m by forced application with butane torch over entire roof area with minimum overlaps of 100mm at the sides/ longitudinal edges of strips membrane and 150mm at the ends and sealed in after cleaning surface complete all as specified and directed all as per manufacturer's instructions. | 200.00 | Sqm |
| 5 | M&L for PCC 1:5:10 type E2 (using 40 mm graded crushed stone aggregate) as in filling, foundation and mass concrete in sunken floor complete all as specified and directed. | 11.97 | Cum |
6 Days Left