| Tender ID | 4968993 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maintenance To Road, Path, Interlocking Paver Block, Kerb Stone, Hardstanding And Road Furniture At Af Stn Gurgaon Under Ge (af) Gurgaon No 1 |
| Last Date For Submission | 19th Aug, 2026 |
| Opening Date | 21 Aug, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 195000.00 |
| Estimated Cost | 12000000.00 |
| City | Gurgaon |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material and Labour scarifying & picking gravelled,macadam or bituminous macadam surfaces in area not exc 400 sqm depth exc 50 mm and not exc 100mm deep, and removing n exc 50 metres and stacking complete all as specified and directed. | 20.00 | TEN SQUARE METER |
| 2 | Material and Labour for 150mm thick (compacted thickness) WBM to be spread, levelled, rolled and compacted in two layers of 75mm thick each of granite,trap or basalt coarse aggregates of grading 2 (63 to 40 mm size) or of grading 3 (50 to 20mm) spread, rolled and consolidated to gradient and camber required complete all as specified and as directed. Note- Each layer of 75mm WBM (compacted thickness) to be measured and paid separately. | 20.00 | TEN SQUARE METER |
| 3 | Material and Labour for applying paving bitumen evenly a priming/tack coat with bituminous primer at 10 kg per 10 Sqm of VG-10 grade for WBM surface complete all as spcified and directed. | 20.00 | TEN SQUARE METER |
| 4 | Bituminous semi dense asphaltic concrete 40mm consolidated thickness with 5.50% binder content by weight of total mix using paving bitumen VG-30 grade laid with mechanical paver, rolled and compacted to required camber and gradient with power road roller exceeding 8 tonne and not exceeding 12 tonne, complete all as specified and directed. | 20.00 | TEN SQUARE METER |
| 5 | Material and Labour for Preparing surfaces by brushing with wire brushes for removing caked mud ect sweeping with brooms and finally cleaned surfaces with Air compresser to remove all loose dust of runsureced water bound macadam complete all as specified and directed. | 20.00 | TEN SQUARE METER |