Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026109 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Maint And Repair To Diesel Generator Set External Water Supply Submersible Pumps Booster Pumps Sets Replacing Of Old U/s Di/gi Tubing Gate Valves Sluice Valve And Periodical Maint And Servicing Oft Acs And Replacement Of Lt Ug Cable Lt Panel Securtiy Light And C |
| Last Date For Submission | 10th Aug, 2026 |
| Opening Date | 12 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 98000.00 |
| Estimated Cost | 4900000.00 |
| City | Gurgaon |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Servicing, Oiling, Greasing and Cleaning of split type AC 1.5 Ton Capacity with high pressure pump of any capacity, checking of defects/ leaking and adjusting setting to work and testing complete all as specified & directed.by Engineer in charge . | 48.00 | Each Job |
| 2 | Servicing, Oiling, Greasing and Cleaning of split type AC 2.0 Ton Capacity with high pressure pump of any capacity, checking of defects/ leaking and adjusting setting to work and testing complete all as specified & directed.by Engineer in charge . | 20.00 | Each Job |
| 3 | M & L for cutting of suction line and discharge line tubing of AC, front scaled unit de-scaling, flushing out condenser and cooling coil thoroughly and reconnecting with the seal unit and charging of gas with required qty of refrigerant for 1.5 ton Split type AC | 8.00 | Each |
| 4 | All as per item No 3 described here-in-before but 2 ton capacity split type AC complete all as specifed & directed. | 5.00 | Each |
| 5 | M& L for detection/ rectification of leakage of gas in the Split AC of capaicty 1.5 /2.0 Ton and gas charging in the system with appropriate qty of gas including testing for smooth functioning of AC of capacity 1.5 /2.0 Ton complete all as specified and as directed . Note :-(i) Unserviceable condensing coil if reqd shall be measured and paid for separately .(ii) Cost of dismantling of unserviceable compressor if reqd deemed to be included in unit rate . (iii) compressor shall be measured and paid separately under respective items of sch 'A".(iv) Refilling & topping up refrigent (type & quantity as required on site is deemed to be included in quoted rates only) | 40.00 | Each Job |
20 Days Left