Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3523523 |
|---|---|
| Organisation Name | Public Works Health and Education Department |
| Tender Brief | Corrigendum : Construction Of Srimantasankaradeva University Of Health Sciences Permanent Building In The Campus Of Pragjyotishpur Medical College, Guwahati, Assam |
| Last Date For Submission | 10th Apr, 2026 |
| Opening Date | 10 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 17139587.00 |
| Estimated Cost | 856979348.00 |
| City | Guwahati |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | BUILDING WORK COMPLETE | ||
| 2 | Design and Build of the Main Building, Auditorium, Electric Substation & Service Block, Civil External development works, Infrastructure & External Development Electrical Works, HVAC work and Furniture work. The project shall be executed in accordance with stipulated DBR/Specifications and Guidelines, adopting NBC-2016 norms, relevant Indian Standard (IS) Codes, and as per the directions of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed. | 1.000 | Job |
| 3 | SALVAGE | ||
| 4 | Credit for Demolition of building structures etc. complete and taking away all fetched material out of campus within 30 days after completing demolition part except the C&D waste kept for recycling and used the recycle product for non structural work such as in foot path, manhole, lean concrete, filling under plinth, re-filling of foundation etc. or as approved by Engineer-in-charge complete in all respect. The serviceable material received from dismantling/demolishing to be kept with executing agency and take away from the site as per direction of Engineer-in-charge. Note : This amount to be paid by agency to the department. Quote the lump sum amount (in minus) | 1.000 | Job |
| 5 | Provisional Sum of Rs. 3,58,50,637/- (Rupees Three Crore Fifty Eight Lacs Fifty Thousand Six Hundred Thirty Seven) Only will be reimbursed based on the actual expenditure on External Electrification, Water Supply Connection etc. |
13 Days Left