Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5017573 |
|---|---|
| Organisation Name | Ministry Of Road Transport And Highways |
| Tender Brief | Strengthening Work From 0.00 Paswan Chowk To 58.450 Musharigharari Of Nh 103 New Nh 322 On Epc Mode In State Of Bihar Repair On Risk And Cost.. |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 135500.00 |
| Estimated Cost | 6765214.00 |
| City | HAJIPUR |
|---|---|
| State | Bihar |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 2.02 Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area 25 % | 4.185 | Hect |
| 2 | 4.14B Wet Mix Macadam (Plant Mix Method:-)Providing, laying, spreading and compacting graded stone aggregate mixed with cement to crushed stone treated base specification including pre mixing the material with water at OMC. in Mechanical mix plant carriage of mixed Material by tipper to site ,laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 84.000 | cum |
| 3 | 5.01(i) Prime Coat over WMM/WBM:-Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 560.000 | sqm |
| 4 | 5.02 (i) Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1626.12 | M2 |
| 5 | 5.04 (B) Dense graded Bitumenious Macadam Grading-II Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. (with VG-40 Grade Bitumen) | 60.77 | Cum |
6 Days Left