| 2 | Design, Detailed Engineering, Manufacturing/Supply, Dismantling of Existing System, Retrofitting, Installation, Testing & Commissioning of Complete Inergen (IG-541) Fire Suppression System, Including Cylinders, Piping Network, Nozzles, Detection & Actuation System Integration with Existing Control Panels & Fire Alarm System, Inspection & Testing by Third Party Inspection Agency (TPIA), Packing, Forwarding, Loading, Transportation, Transit Insurance, Unloading, Safe Storage at Site, Conducting Performance Tests, Training of Personnel, and Handing Over with Complete Documentation for IndianOil Petronas Pvt. Ltd., LPG Import/Export Terminal, Haldia
NB-considering new cylinders, actuator, Regulator/Discharge Check Valve Assy, hose, adaptors, bleed and vent valves, Nozzle (UL/FM), name plate, deflector shield, piping etc. | 1.00 | LOT |