Tender ID4224745
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Of Balance Work Of New Bus Stand Hamirpur At Pucca Bharo Near Bye Pass Junction Hamirpur
Last Date For Submission19th May, 2026
Opening Date19 May, 2026
Cost
Document Cost10000.00
EMD3165000.00
Estimated Cost216494790.00
Location
CityHamirpur(HP)
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and as directed by the Engineer -in-Charge at site and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) for the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour (if required) including entire carriage of material with in all leads and lifts and as per drawings and technical specifications and the direction of Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.2718.030Per Cubic metre
2Centering and shuttering including strutting, propping etcetera and removal of form work for Suspended floors, roofs, landings, balconies and access plat form in including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.5181.230Per square metre
3Lintels, beams, plinth beams, girders, bressumers and cantilevers6605.710Per square metre
4Columns, piers, abutments, pillars, posts and struts1581.190Per square metre
5Stairs, (excluding landings) except spiral stair cases317.010Per square metre