Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4224745 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Of Balance Work Of New Bus Stand Hamirpur At Pucca Bharo Near Bye Pass Junction Hamirpur |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 19 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 3165000.00 |
| Estimated Cost | 216494790.00 |
| City | Hamirpur(HP) |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and as directed by the Engineer -in-Charge at site and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) for the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour (if required) including entire carriage of material with in all leads and lifts and as per drawings and technical specifications and the direction of Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 2718.030 | Per Cubic metre |
| 2 | Centering and shuttering including strutting, propping etcetera and removal of form work for Suspended floors, roofs, landings, balconies and access plat form in including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 5181.230 | Per square metre |
| 3 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 6605.710 | Per square metre |
| 4 | Columns, piers, abutments, pillars, posts and struts | 1581.190 | Per square metre |
| 5 | Stairs, (excluding landings) except spiral stair cases | 317.010 | Per square metre |
4 Days Left