Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Pashchimanchal Vidyut Vitran Nigam Limited
Tender ID3776641
Organisation NamePashchimanchal Vidyut Vitran Nigam Limited
Tender BriefCorrigendum : Work Of Repair/maintenance Of Damaged Protection Relays, 11 Kv Switchgear And Other Associated Protection Relays Installed At 54 Nos. Power Substations For Ensuring Smooth Power Supply Under Operation And Maintenance Head Within The Under Edc Hapur
Last Date For Submission4th Apr, 2026
Opening Date04 Apr, 2026
Cost
Document Cost3540.00
EMD46260.00
Estimated Cost4626000.00
Location
CityHapur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1SERVICING AND REPAIRING OF ELECTRICAL AND MECHANICAL SYSTEM FOR PROPER OPENING, CLOSING & TRIPPING OF 11 KV BREAKER (WARRANTY PERIOD WILL BE SIX MONTH) (DATE OF REPAIR WILL BE MENTIONED AFTER REMOVAL OF FAULT ON PANNEL WITH PERMANENT MARKER OR PAINT AND IN MAINTENANCE REGISTER ALSO.) ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS100Nos.
2IN CASE OF EMERGENCY BREAKDOWN VCB REPAIRING ETC WORK LINE CLEANING AND REFITTING AFTER REMOVAL OF FAULT WITH IN 1 HOUR AFTER GETTING INFORMATION AND WARRANTY PERIOD WILL BE SIX MONTH. (DATE OF REPAIR WILL BE MENTIONED AFTER REMOVAL OF FAULT ON PANNEL WITH PERMANENT MARKER OR PAINT AND IN MAINTENANCE REGISTER ALSO.) ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS90Nos.
3PROVIDING, REPLACEMENT AND COMMISSNING OF 11 KV CT 600/300/5 As per RESSPO Norms. (Make GCL, BHEL, SCHEMER, L&T TOSIBA, YAMUNA, C-SEC, PASCAL, STELMAKE ETC. ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS10Nos.
4PROVIDING, REPLACEMENT AND COMMISSNING OF 11 KV CT 400/200/5 As per RESSPO Norms. (Make GCL, BHEL, SCHEMER, L&T TOSIBA, STELSTELMAKE ETC. ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS30Nos.
5PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE 11 KV POTENTIAL TRANSFORMER ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS5Nos.
4th Apr, 2026

7 Days Left