| Tender ID | 4753592 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Corrigendum : Making Ramp 3 Nos For Temporary Steel Truss Foot Bridge No. 1,2 And 3 For Kumbh Mela-2027 At Har Ki Pauri Haridwar.. |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 4720.00 |
|---|---|
| EMD | 346120.00 |
| Estimated Cost | 0.00 |
| City | Haridwar |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Making Ramp 3 Nos for Temporary Steel truss Foot Bridge No. 1,2 & 3 for Kumbh mela 2027 at Har ki Pauri Haridwar. | ||
| 2 | Gravel/Soil-Aggregate Base (Table 400.2) Grading A Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 for construction of Ramp of Temporary bridge no. 1,2 & 3 at Har ki Pauri, Haridwar for Kumbh Mela 2027 (Ramp 03 No.each size 65m long x 4 m width). | 4683.000 | cum |
| 3 | Steel work welded in built up sections/ framed work. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. As required in railings for Ramp of Temporary bridge no. 1,2 & 3 at Har ki Pauri, Haridwar for Kumbh Mela 2027. | 18002.000 | kg |
| 4 | Providing & laying of Empty cement bag filled with local sand & tightened using sutli & carriage upto site including prepairing sub grade before placing in position also including supply of material, labour & T&P. | 29900.000 | Nos |
| 5 | Hiring of hydraulic excavator 0.90/1.00 cum (1nos x 15days x 8hrs) for preparing of ramp base/Approach road and Dismaintling of 3 nos Ramp each 60 mtr long made up of gravel/Soil- Aggregate Base and M.S railing after completion of Kumbh Mela 2027, including all cost of material, labour, Scaffolding and T&P. | 120.000 | hrs |