Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3929977 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Renewal By B.c. Of Roorkee-laksar-balawali (sh-26) Motor Road From Km 10 To 19 Under Kumbh Mela 2027. |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 782000.00 |
| Estimated Cost | 39105000.00 |
| City | Haridwar |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, | 102115.50 | Sqm |
| 2 | Providing and laying Dense Bituminous Macadam with the use of batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25% by weight of total mix of mix and filler, transporting the hot mix towork site, laying with a hydrostatic paver finisher with sensor control to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tande mrollers to achieve the desired compaction as per MoRTH specification clauseNo. 507 complete in all respects. Grading II - 26.5mm nominal size *Recovery against difference of quantities of Bitumen and Aggregates shall be done according to bituminous content & Density found actually in field after execute/Job Mix Formula/Estimated which ever is less. (Estimated density 2.31 Tonne/Cum) | 339.53 | Cum |
| 3 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. for Grading-II (bituminous binder @ 5.4 % of mix) (30 mm thick BC) *Recovery against difference of quantities of Bitumen and Aggregates shall be done according to bitumen content & Density found actually in field after execution/ Job Mix Formula/ Estimated which ever is less. (Estimated density 2.356 Tonne/Cum) | 2859.75 | Cum |
| 4 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 3430.00 | Sqm |
| 5 | Maintenance of Earthen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 | 24003.00 | Sqm |
27 Days Left