Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5021831 |
|---|---|
| Organisation Name | Haridwar Roorkee Development Authority |
| Tender Brief | Supply, Installation, Testing and Commissioning Operation And Dismantling Of Temporary Lighting At Bairagi Camp And Other Parking During Kawad Mela 2026 |
| Last Date For Submission | 25th Jul, 2026 |
| Opening Date | 25 Jul, 2026 |
| Document Cost | 3310.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 3376000.00 |
| City | Haridwar |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and fixing double scaffolding system (cup lock type) or wooden scaffolding up to 25 to 30 feet height, made with 40 mm dia M.S. tube or wooden pole 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. Tube challes, M.S. B clamps and M.S. staircase system in scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners. connection, with the building etc whenever required for inspection of work at required locations with essential safety features for the workmen etc. all complete as per the directions of Engineer in Charge. (For complete mela Duration) | 85.000 | NOS |
| 2 | Supplying, fixing and operation (without Electricity Charges) of 50 watt LED Street/Flood light fitting complete along with complete wiring including. Carriage uploading & Erection and Maintenance & dismantling the same after completion of kawad mela the provision of street/flood light all complete as per the direction of engineer in Charge. | 500.000 | NOS |
| 3 | Supplying, fixing and operation (without Electricity Charges) of 100 watt LED Street/Flood light fitting complete along with complete wiring including. Carriage uploading & Erection and Maintenance & dismantling the same after completion of kawad mela the provision of street/flood light all complete as per the direction of engineer in Charge. | 450.000 | NOS |
| 4 | Supplying, fixing and operation (without Electricity Charges) of 200 watt LED Street/Flood light fitting complete along with complete wiring including. Carriage uploading & Erection and Maintenance & dismantling the same after completion of kawad mela the provision of street/flood light all complete as per the direction of engineer in Charge. | 450.000 | NOS |
| 5 | Supplying & operation of 7.5KVA Generator set on Rental Basis including diesel and Distribution box 32 amp: Changeover, LT Cable and associate material all complete as per the direction of Engineer in Charge. (Running time of Generator 7;00 PM to 5;00 AM) | 20.000 | NOS |
4 Days Left