Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4396930 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Production Of Packaged Drinking Water From R.o. Based Fully Automatic Drinking Water Bottling Plant With An Hourly Production Capacity 3600 Bottles Of 500 Ml/1000 Ml Capacity At Haringhata In The District Of Nadia, P.h.e. Dte. |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 136683.00 |
| Estimated Cost | 0.00 |
| City | Haringhata |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART-A (Labour Portion): | ||
| 2 | Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000 ml/500 ml capacity at Haringhata Bottling Plant in the district of Nadia by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rincing filling capping machine (1 No.), labeling machine & batch code machine (1 No.), shirnk wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automation system (1 No.) Security guard (1 No.) per shift including providing necessary personnel for guarding arrangement round the clock. The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant. | 12.00 | month |
| 3 | Provision of Electrician visit to oversee the overall power circuit and electrical accessories and machineries. | 365.00 | days |
| 4 | Part-B (Supervision Portion): | ||
| 5 | Skilled supervisor for supervision of entire installation for trouble free operation including manning, control, output data generation etc. | 12.00 | month |
18 Days Left