Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4855919 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Installation Of Solar Roof Top On Inspction House At Gindoli, Popia, Kacchpura, Etmadpur, Chulahwali And Lohcha Under Irrigation Division Hathras. |
| Last Date For Submission | 11th Jul, 2026 |
| Opening Date | 11 Jul, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 32300.00 |
| Estimated Cost | 1614675.00 |
| City | Hathras |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Solar photo voltaic (On grid) power generation system (a) Supplying,instalation,testing and commissioning of On grid intractive roof top Solar photo voltaic power generation system Fitted at Fabricated M.S Dipped galvanized fixed structure with columns,beam and purlines, Angles and Z-section and Nuts & Bolts Designed to with stand wind speed upto 150km/hr. Completion of Work as directed by Engineer-in-charge. At GINDAULI Inspection House. | 5.00 | KW |
| 2 | Solar photo voltaic (On grid) power generation system (a) Supplying,instalation,testing and commissioning of On grid intractive roof top Solar photo voltaic power generation system Fitted at Fabricated M.S Dipped galvanized fixed structure with columns,beam and purlines, Angles and Z-section and Nuts & Bolts Designed to with stand wind speed upto 150km/hr. Completion of Work as directed by Engineer-in-charge. At POPIYA Inspection House. | 5.00 | KW |
| 3 | Solar photo voltaic (On grid) power generation system (a) Supplying,instalation,testing and commissioning of On grid intractive roof top Solar photo voltaic power generation system Fitted at Fabricated M.S Dipped galvanized fixed structure with columns,beam and purlines, Angles and Z-section and Nuts & Bolts Designed to with stand wind speed upto 150km/hr. Completion of Work as directed by Engineer-in-charge. At KACHHPURA Inspection House. | 5.00 | KW |
| 4 | Solar photo voltaic (On grid) power generation system (a) Supplying,instalation,testing and commissioning of On grid intractive roof top Solar photo voltaic power generation system Fitted at Fabricated M.S Dipped galvanized fixed structure with columns,beam and purlines, Angles and Z-section and Nuts & Bolts Designed to with stand wind speed upto 150km/hr. Completion of Work as directed by Engineer-in-charge. At ETMADPUR Inspection House. | 5.00 | KW |
| 5 | Solar photo voltaic (On grid) power generation system (a) Supplying,instalation,testing and commissioning of On grid intractive roof top Solar photo voltaic power generation system Fitted at Fabricated M.S Dipped galvanized fixed structure with columns,beam and purlines, Angles and Z-section and Nuts & Bolts Designed to with stand wind speed upto 150km/hr. Completion of Work as directed by Engineer-in-charge. At CHULAHWALI Inspection House. | 5.00 | KW |
4 Days Left