Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5017181 |
|---|---|
| Organisation Name | Zilla Parishad |
| Tender Brief | Construction Of Pcc Road Guard Wall Drain And Culvert From Ho Banshi Ravidas To Behra River Kalikaran Road Via Kaila Mahto Khet In Village Balsagra Block Dadi District Hazaribag |
| Last Date For Submission | 1st Aug, 2026 |
| Opening Date | 03 Aug, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 281000.00 |
| Estimated Cost | 14034900.00 |
| City | Hazaribag |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area. | 0.640 | Ha. |
| 2 | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.) By Manual means (In area of light jungle) | 0.640 | Ha. |
| 3 | Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.) | 972.450 | M3 |
| 4 | Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.) | 4337.500 | M3 |
| 5 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.) | 485.990 | M3 |
11 Days Left